CU BoulderBioastronautics & Engineering Management
Italian Space AgencyLunar habitation & power sizing
Aurora RocketryAvionics, power & hardware testing
Selected projects
The work behind the resume.
My contributions, the engineering choices, and the evidence behind the results. All projects →
01 Italian Space Agency + bachelor’s thesis
A lunar eclipse becomes a battery-mass problem.
I built a Python model to size vertical solar arrays and storage for a lunar habitat. Under the reference assumptions, batteries account for 60% of the modeled power-system mass, including margin.
I designed most of the ground-station PCB, contributed to the onboard board, and developed Nemesis’s telemetry link. A recovery-system failure at EuRoC 2025 changed how we verified components before integration.
I lead a ten-person team through preliminary design. One current decision: run air filtration from launch, or activate it 24 hours before crew arrival?
I consider the ISS one of humanity’s greatest achievements. The idea that people continuously live and work beyond Earth is what drew me toward habitats and life support.
At ASI, I studied the technologies needed for lunar habitation. At CU Boulder, I am learning to connect crew needs to engineering requirements while taking responsibility for a multidisciplinary team’s design decisions.
I am particularly interested in CO₂ removal and water and oxygen recovery, and in how technologies developed for space could help people in extreme environments on Earth.